11-04-2005, 03:54 PM
|
#1 (permalink)
|
|
SRTforums Member
Join Date: Feb 2003
Member Number: 272
Location: Oceanside, Cali
Posts: 26,097
|
DCx Plant Production update: 4 November 2005
PLATFORM: 300, Magnum, and Charger
- AWD models have a 12-14 week lead time
- (PYH) Top Banana has a final build date of 1/31/06
- (DGV) VLP Transmission has a Job #1 of 12/1/05
- (29R) Heritage Edition has a Job #1 of 2/1/06 (LXCS48)
- Non-variable line pressure transmission has a final build date of 11/30/05
- (PRH) Inferno Red Crystal Pearl has a Job #1 of 5/1/06 (LXCX48)
- (XRV) Rear video system is on hold (LXDX49)
- (*ML) Leather w/ (CFW) rear bench seat is on hold
- (JPD) Power windows, driver one-touch has a Job #1 of 11/17/05
- (27P) Signature Series w (AFB) Comfort Group has a final build date of 12/23/05
- (P99) Unreleased paint has a Job #1 of 2/1/06 ????
|
|
|